1. NDTQUAM industrial film processing chemical for automatic processor

Type Product
H6 fixure for machine A : 5L*2 B:0.5L*2 Get 38L fluid
H7 developer for machine A : 5L*2 B:0.5L*2 Get 38L fluid

The development temperature should be controlled at 26-30 ° C for 8-12 minutes
The fixing temperature is controlled at 26-28 ° C for 8-12 minutes.
Chemicals should be stored in their original packaging in a dry place at a temperature of+5~+20 ℃ and a relative humidity of 40~50%. The storage period should not exceed 24 months.

2. NDTQUAM industrial film processing chemical for manual processing

Type Product
A6 Developer 4L*2 To make 40L processing solution
A7 Fixer 4L*2 To make 40L processing solution

Processing conditions

Recommended standard development conditions:

Temperature Developing time
18~24℃ 3~5 Minutes

Notice: The processing tank should be closed with cover.

Recommended standard fixing conditions:

Temperature Fixing time
18~24℃ 3~5 Minutes

Storage

The chemicals should be stored in the original packing in a dry place at temperatures +5 to +25℃ and relative humidity 40 to 50% , for a period not exceeding 24 months.

3. FUHATA (FUJIFILM) Industrial X-ray film developer &fixer for manual processing

Product Type Description Dilution(with water)
developer & fixer for manual processing 755203 Developer 4L*2 To make 40L processing solution
755201 Fixer 4L*2 To make 40L processing solution

Processing conditions

Recommended standard development conditions:

Temperature Developing time
18~24℃ 3~5 Minutes

Notice: The processing tank should be closed with cover.

Recommended standard fixing conditions:

Temperature Fixing time
18~24℃ 3~5 Minutes

Storage

The chemicals should be stored in the original packing in a dry place at temperatures +5 to +25℃ and relative humidity 40 to 50% , for a period not exceeding 24 months.

4. FUJIFILM Industrial X-ray film developer & fixer for automatic processor

Product Type Description Dilution(with water)
developer & fixer for automatic processor 855303 Developer A:5L*2 B:0.5L*2 BC:0.15L*2 Get 38L processing solution
855301 FixerA:5L*2 B:0.5L*2 Get 38L processing solution

Note: After mixing, let it stand for two hours before use

Processing conditions

Recommended standard development conditions:

Temperature Developing time
26~30℃ 7-11 Minutes

Recommended standard fixing conditions:

Temperature Fixing time
26~2830℃ 7-11 Minutes

The chemicals should be stored in the original packing in a dry place at temperatures
+5 to +25℃ and relative humidity 40 to 50% , for a period not exceeding 24 months.
A possible crystalline fraction in parts A and C is not a defect. It will dissolve again
after heating to 40℃ and agitation the solution.